The measurement of crane span is also the measurement of crane track distance. Crane track span measurement is a very important step before the production and installation of cranes. Once the Crane for sale span measurement is wrong, the crane cannot be installed and used, and it needs to be modified twice. Therefore, the span measurement of the crane is very important, so how to measure the span of the crane track, I will give you a detailed introduction today.
Crane span measurement
1. The span measurement conditions of general bridge (gantry) cranes should meet the following requirements:
1.1. The span measurement of indoor bridge gantry crane should be placed horizontally;
1.2. The span measurement of outdoor single and double beam cranes should be placed horizontally and measured under no wind conditions;
1.2. When measuring the span of the crane, the temperature of the steel tape measure and the crane track should be the same, and the steel tape measure must not swing and sag naturally;
1.3. The steel tape should be qualified by the provincial level-approved metrology department and within the validity period;
1.4. The span of the crane cannot be calculated and must be actually measured;
△S =S side+△1+△2-S (Append 1.1)
In the formula: S side——measured value of span (mm);
S——theoretical value of span (mm);
△1——Measurement correction value of steel tape (mm);
△2——The correction value of steel tape (mm), which can be taken according to the attached table 1.1 or the attached table 1.2;
△S0 =S0 test +△1+△2+△3-S0 (Append 1.2)
In the formula: △S0——measured value of track span (mm);
△1——Measurement correction value of steel tape (mm);
△2——Correction value of steel tape (mm), take the value according to attached table 1.1 or attached table 1.2;
△3=αS0(t-20) (attached 1.3)
In the formula: α——The coefficient of linear expansion of steel tape is 11.5×10-6/℃;
t——The actual temperature during measurement (℃);
S0——theoretical value of crane track span (m).
Diagram of correction value of steel tape when measuring single and double beam bridge gantry crane
6. The location of crane track span measurement should be determined according to attached drawings 1.5 to 1.8.
The span measurement of the crane should be as accurate as possible to reduce errors and avoid the inaccuracy of the measurement, which may cause normal installation and use.