5 ton electric crane machine trolley design and production for Pakistan customer. This electric crane trolley order is from DQCRANE’s old client. The electric carriage was required its motor and electrics must be the European brand.
European Crane and Electric Trolley Advantages
With the constant efforts, Dongqi Group has made great achievements in the design and production of European cranes, meanwhile occupy a place of European crane market.
European crane is one kind new developed crane which is accorded with the FEM/DIN standard.It includes the advantage such as the light dead weight, small wheel pressure, compact structure, low energy consumption and VFFD speed etc.
Compared with the traditional crane, the limit distance between well and hook is much smaller and lifting height is much higher so as to increase the working place of the existing warehouse.
European Type Electric Trolley for Double Girder Overhead Crane
On July, 2016, we received one inquiry from Peoples’ steel mill to purchase the new double rail electric trolley for their existing crane, and we got the below specification:
Double rail electric trolley
- Lifting capacity: 5tons
- Lifting height: 9meters
- Gauge: 1.1meters, 1.5meters and 1.62meters
- Motor and electrics must be the European brand.
How We Get the 5 Ton Electric Trolley Order from Pakistan Customers?
Once we get the above specifications, we talked with our designer engineer and conclude the technical & commercial offer for them.
Lifting capacity and lifting height are the normal specifications and no problem.The gauge is the rail to rail distance of the traveling trolley. As our standard double girder overhead crane is from 1.5meters to 2meters.After our discussion, we can customized the 1.1meters gauge for them.
We select the ABM Germany three-in-one motor and Schneider electrics for them. Three-in-one motor is the reducer motor which means motor, reducer and gearbox together as one. All electrics such as the contactor, inverter and switches are come from Schneider France.
Finally we satisfied all the questions for the Peoples’ Steel Mill, then we get the 5 ton electric crane trolley order.
Once we get the original irrevocable letter of credit from our customer, we start the production. Production last 25 working days. Below please take reference of some actual pictures.
没有评论:
发表评论